North Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi?
Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi?
Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi?
?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi?
US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty Anti-Empire >>
Parse failure for http://humanrights.ie/feed/. Last Retry Sunday September 21, 2025 00:54
Somalian Migrant Living in Epping Hotel Thanks Keir Starmer ?From the Bottom of my Heart? After Winn... Sat Sep 20, 2025 15:00 | Will Jones A Somalian migrant living at the Bell Hotel in Epping has thanked Keir Starmer?"from the bottom" of his heart after winning the right to stay in Britain on human rights grounds as he prepares to settle in Yorkshire.
The post Somalian Migrant Living in Epping Hotel Thanks Keir Starmer “From the Bottom of my Heart” After Winning Right to Stay in UK appeared first on The Daily Sceptic.
Oxford Students ?Mocked the Assassination of Charlie Kirk on WhatsApp and Tried to Silence Anyone Wh... Sat Sep 20, 2025 13:00 | Will Jones Students with links to Oxford University?have mocked the assassination of?Charlie Kirk on WhatsApp?and tried to silence others who did not agree, it's been reported, with many explicitly endorsing political violence.
The post Oxford Students “Mocked the Assassination of Charlie Kirk on WhatsApp and Tried to Silence Anyone Who Didn’t Agree” appeared first on The Daily Sceptic.
?Britain Can?t Deport Me?: Calais Migrants Vow to Keep Crossing Channel Sat Sep 20, 2025 11:00 | Will Jones Migrants in Calais have vowed to cross the Channel "again and again", saying "Britain can't deport me", as Keir Starmer's 'one in, one out' deal?with France faces a wave of legal challenges.
The post “Britain Can’t Deport Me”: Calais Migrants Vow to Keep Crossing Channel appeared first on The Daily Sceptic.
Sun and Cosmic Rays Drive Climate, Not CO2, Says Astrophysicist Sat Sep 20, 2025 09:00 | Hannes Sarv It's not CO2 that drives the climate, says astrophysicist Dr Henrik Svensmark. Its the Sun and cosmic rays. But you won't hear about this because only one viewpoint is now allowed in the pseudo-science of climate.
The post Sun and Cosmic Rays Drive Climate, Not CO2, Says Astrophysicist appeared first on The Daily Sceptic.
The ?Far Left? Finally Gets Its Comeuppance Sat Sep 20, 2025 07:00 | James Alexander For years the Left has smeared its opponents as 'far Right'. Now, the spike in Leftist political violence has led to a turning of the tables. What's sauce for the goose is sauce for the Guardian, says Prof James Alexander.
The post The ‘Far Left’ Finally Gets Its Comeuppance appeared first on The Daily Sceptic. Lockdown Skeptics >>
Voltaire, international edition
Will intergovernmental institutions withstand the end of the "American Empire"?,... Sat Apr 05, 2025 07:15 | en
Voltaire, International Newsletter N?127 Sat Apr 05, 2025 06:38 | en
Disintegration of Western democracy begins in France Sat Apr 05, 2025 06:00 | en
Voltaire, International Newsletter N?126 Fri Mar 28, 2025 11:39 | en
The International Conference on Combating Anti-Semitism by Amichai Chikli and Na... Fri Mar 28, 2025 11:31 | en Voltaire Network >>
|
Government outsources “dealing with protestors”
national |
miscellaneous |
opinion/analysis
Tuesday April 17, 2007 22:40 by El Bull

In February of this year, the government released new forms of contract to be used for the procurement of public sector construction projects. Designed to deliver cost certainty, the new forms of contract transfer considerable risk to the Contractor. It is widely accepted that one of the results of these controversial new contracts will actually be higher construction costs, albeit with certainty about the (higher) contract prices. However, there are some other very significant implications of these new contracts, in particular with regard to how protestors will be treated on construction sites in the future. Earlier on this year, the government brought into force, without any attendant fanfare or such publicity seeking measures, a brand new form of contract for use on public procurement contracts.
Nothing too exciting here, it might appear. Why shouldn’t the state update its procedures for procuring public projects, with the stated aim of achieving price certainty? After all, if the government is spending billions of our euros, shouldn’t they make sure that they are using the best and most up to date documents & contracts available? Especially given that the Contractors building these projects are creaming it in with massive cost over-runs. Well, just on those issues, there are a few points worth noting:
> The contracts that were in place heretofore for public procurement contracts were long established and have been tried and tested. For example, the “Conditions of Contract for use in connection with Works of Civil Engineering Construction" (third edition) were adopted by the Institution of Engineers of Ireland in 1980 and have had just about every clause tested in the courts, so there was a high degree of legal certainty attached to contracts administered under these conditions.
> Other conditions that have been used in Ireland in recent times, such as the FIDIC suite of contracts, are in use internationally and have the advantage of offering varying degrees of price certainty.
> The introduction of the new contracts this year achieved the remarkable feat of uniting Contractors, Architects, Engineers, Surveyors and their respective organisations in opposition to their introduction. There is unanimous dissatisfaction throughout the industry with these contracts, which are being pushed through by the Dept. of Finance.
But that’s all incidental to the point of this article. I want to discuss a couple of interesting clauses of these new contracts, which haven’t had much of an airing to date. Just before I do, I’ll provide a few more introductory comments on these contracts.
The new Forms of Construction Contracts for Public Works, to give this suite of documents their full title, have been in effect since the 19th February 2007. Their implementation comes on the back of almost 3 years of planning and consultation. They were brought in as a value for money initiative, to address cost over-runs.
The key element of these contracts is that Contractors submitting a tender for a public works contract will have to submit a fixed price lump sum tender. In order to achieve this, it is necessary to clearly set out which risks are assumed by the client and which risks are assumed by the Contractor. One of the most controversial features of these contracts is that a huge amount of risk has been transferred to the Contractor. There is a strong consensus throughout the industry that the government has gone too far and has transferred too much risk to the Contractor. It is widely acknowledged that one of the results of this inappropriate transfer of risks is going to be more expensive contract prices. Isn’t that some irony – the government is getting price certainty, only it’s going to be a higher price! This is almost inevitable, because Contractors putting together a tender for a project will have to include for costs associated with a host of different costs, which may or may not arise in the contract.
There is a very interesting clause tucked away in these contracts. Clause 7.2 transfers all risks associated with Trespassers, onto the Contractor, viz. “…the Contractor shall be responsible for activities of trespassers, protesters and others… on the site”. The implications of this clause are massive.
Picture your typical motorway project going through a woodland that eco-protestors want to protect (not an unknown situation in Ireland). A few dozen environmentalists up a tree halt work. However, it is no longer the government footing the bill (which can run up to millions of euro in no time at all). It’s the Contractor who is responsible for such costs. Now, the question is, how will the Contractor deal with such trespasses onto his site? Methinks that Contractors will be much more sensitive to the costs involved that the government has been previously, and much less accommodating of protestors on their sites.
Another risk that is transferred to the Contractor relates to Archaeological Objects, viz. “If any fossils, coins, antiquities, monuments… are discovered… the Contractor shall not disturb them, but shall take all necessary steps to preserve them, and shall promptly notify the Employers Representative [and comply with any instructions]”. Just picture it – the Contractor is now responsible for preserving any archaeological monument that he comes across during his works. Anyone know the cost of dealing with all those Vikings uncovered during the construction of the Waterford ring road? Anyone think a Contractor will do his best to preserve such findings, in the event of such a discovery under the new contracts?
In conclusion, I would like to point out that my comments are not intended to reflect on the character or motivation of Contractors; rather, they are observations on the financial drivers & motivators that this new suite of contracts gives rise to.
|